当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Regarding the number of 11kV HT busduct CTs to be replace at each site, each CT in 11kV HT busduct consists of Two (2) cores (Protection & metering core on phase side and both protection cores on neutral side), replacing only one set of protection core CTs with new set of CTs will also mismatch with the existing CT pa是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Regarding the number of 11kV HT busduct CTs to be replace at each site, each CT in 11kV HT busduct consists of Two (2) cores (Protection & metering core on phase side and both protection cores on neutral side), replacing only one set of protection core CTs with new set of CTs will also mismatch with the existing CT pa
问题补充:

  • 匿名
2013-05-23 12:21:38
关于11千伏HT母线槽电流互感器的数量要取代在每个站点,每个CT在11kV的HT母线槽由两个(2)核心(保护和计量的核心相位侧和中性侧保护双方的核心) ,只更换一组
  • 匿名
2013-05-23 12:23:18
关于busduct是的CTs在每个站点11kV HT的数量,在11kV HT busduct的每个CT替换只包括两(2)核心(保护&测量的核心在阶段边和两个保护核心在中立边),替换一套保护核心CTs用新的套CTs也将配错与现有的CT参量。因此应该在每个站点替换CTs (在阶段边& 1个集合的2个集合成套在中立边)如如下所述。
  • 匿名
2013-05-23 12:24:58
关于11kV HT busduct是CTs的数字替换在每个站点,每CT在11kV HT busduct包括二 (2个) 核心 (保护&测量的核心在阶段边和两个保护核心在中立边),替换一套保护核心CTs用新的套CTs也只将配错以现有的CT参量。 因此应该替换CTs (完整集2个集合在阶段边& 1个集合) 在中立边如叙述如下在每个站点。
  • 匿名
2013-05-23 12:26:38
有关的 11 千伏特 HT 母线 CTs 要在每个站点替换,每个 CT 在 11 千伏 HT 桥架上包括两 2 芯 (保护 & 计量的核心阶段一边和中性一边两个保护核心),取代只有一套保护核心套新的 CTs CTs 将还与不匹配的现有的 CT 参数。因此应在每个站点更换套完整的 CTs (相侧 2 套 & 1 套中性侧) 正如提到的下面。
  • 匿名
2013-05-23 12:28:18
关于 11kV HT busduct 数量 CTs 替换在每地点, 11kV 中的每 CT 此时 busduct 包含二 (2) 核心 ( 保护 & metering 有关阶段边的核心和有关中立的方面的保护核心 ),替换仅仅一套保护核心具新一套 CTs 的 CTs 也将有现有 CT 参数的错配。因此完成一套 CTs ( 在阶段边上的 2 套和中立的方面上的 1 套 ) 如提及应该在下边在每地点被替换。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭