当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:462.3. Construction. A. Excavation, Shaping, Bedding, and Backfill. Excavate, shape, bed, and backfill in accordance with Item 400, “Excavation and Backfill for Structures,” except where jacking, boring, or tunneling methods are shown on the plans or are permitted. Jack, bore, or tunnel in accordance with Item 476, “Ja是什么意思?

待解决 悬赏分:1 - 离问题结束还有
462.3. Construction. A. Excavation, Shaping, Bedding, and Backfill. Excavate, shape, bed, and backfill in accordance with Item 400, “Excavation and Backfill for Structures,” except where jacking, boring, or tunneling methods are shown on the plans or are permitted. Jack, bore, or tunnel in accordance with Item 476, “Ja
问题补充:

  • 匿名
2013-05-23 12:21:38
462.3 。
  • 匿名
2013-05-23 12:23:18
462.3. 建筑。A. Excavation,塑造,卧具,和重新填没。挖掘,塑造,供住宿,并且重新填没符合项目400, “挖掘并且为结构重新填没”,除了顶起,不耐烦或者挖洞方法在计划显示或被允许的地方。杰克、打扰或者隧道符合项目476, “顶起,不耐烦或者挖洞管子或箱子”。除灰浆之外,对于联接包括材料的所有盒式结构,直接重新填没被允许。
  • 匿名
2013-05-23 12:24:58
462.3. 建筑。 A. 挖掘,塑造,卧具,和重新填没。 挖掘,塑造,供住宿,并且重新填没与项目400, “挖掘符合并且为结构重新填没”,除了顶起,不耐烦或者挖洞方法在计划显示或被允许的地方。 杰克、打扰或者隧道与项目476符合, “顶起,不耐烦或者挖洞管子或箱子”。 除灰浆之外,为所有盒式结构,联接包括材料,直接重新填没被允许。 作为防备措施在放和变紧密重新填没避免箱子或损伤的任何运动对联接的。 去除并且替换承包商损坏的箱子对部门免费。
  • 匿名
2013-05-23 12:26:38
462.3.施工。A.开挖、 塑造、 床上用品,和回填。挖掘、 形状、 床上和根据项目 400,"开挖和回填土的结构,"除了在顶、 无聊,抑或是隧道方法回填上计划显示或被允许。杰克、 孔或隧道根据项 476,"顶管、 镗孔、 或隧道管或者框。对于所有的箱形结构在哪里接头包括除砂浆的材料,允许使用立即回填。采取预防措施在放置和密实回填土,避免任何运动的框或关节受损。卸下并更换盒承建商在没有费用向处损坏。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭