求翻译:Usually bridge construction contracts are based on unit prices for materials worked into the structure,such as concrete by the cubic yard and reinforcing steel by the pound for cast-in-place concrete,and precast concrete girders and piles the lineal foot,etc.是什么意思?![]() ![]() Usually bridge construction contracts are based on unit prices for materials worked into the structure,such as concrete by the cubic yard and reinforcing steel by the pound for cast-in-place concrete,and precast concrete girders and piles the lineal foot,etc.
问题补充: |
|
2013-05-23 12:21:38
通常桥梁建设合同是基于单元的价格为材料加工成的结构,如混凝土的立方码和钢筋的英镑铸现浇混凝土,预制混凝土梁和桩线英尺,等等。
|
|
2013-05-23 12:23:18
通常桥梁建筑合同根据材料的单价运作入结构,例如混凝土在立方码旁边和钢筋在塑象在地方混凝土的磅旁边和预制混凝土大梁和堆线形脚等等。
|
|
2013-05-23 12:24:58
通常桥梁建筑合同根据单价为材料运作入结构,例如混凝土在立方码旁边和加强钢在磅旁边为cast-in-place混凝土和预制混凝土大梁和堆线形脚等等。
|
|
2013-05-23 12:26:38
通常桥梁施工合约基于工作到结构如按立方码的混凝土和钢筋的材料的单位价格由磅为现浇在就地混凝土,及预制混凝土梁和桩的直系脚等。
|
|