当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Supply, delivery, installation, testing, commissioning for outgoing cable from main board EMB-T2E-SS-01 to the following isolator in Main Terminal. It shall also include cable support, terminations, mounting, labelling, associated accessories and building works necessary to provide the complete system as specified and是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Supply, delivery, installation, testing, commissioning for outgoing cable from main board EMB-T2E-SS-01 to the following isolator in Main Terminal. It shall also include cable support, terminations, mounting, labelling, associated accessories and building works necessary to provide the complete system as specified and
问题补充:

  • 匿名
2013-05-23 12:21:38
供应,交付,安装,调试,试传出电缆从主板EMB- T2E -SS -01在主航站楼以下隔离。
  • 匿名
2013-05-23 12:23:18
供应,交付,设施,测试,委任为从主板EMB-T2E-SS-01的外出的缆绳对以下绝缘物在主要终端。它也将包括电缆支持、终止,架置,标记,联系的辅助部件和必要修造的工作提供完整系统如指定和依从相关的代码
  • 匿名
2013-05-23 12:24:58
供应,交付,设施,测试,委任对于外出的缆绳从主板EMB-T2E-SS-01到以下绝缘物在主要终端。 它也将包括电缆支持、终止,架置,标记,联系的辅助部件和修造的工作必要提供完整系统如指定和依从相关的代码
  • 匿名
2013-05-23 12:26:38
供应、 交付、 安装、 测试、 调试主板教统局-T2E-SS-01 至以下的隔振器在主终端传出电缆。它还应包括电缆支架、 终端、 安装、 标签、 相关的配件和建筑工程需要提供完整的系统,作为指定和遵守有关守则
  • 匿名
2013-05-23 12:28:18
供应,发送,安装,检查,对来自主要董事会的离去的电缆为的委托 EMB-T2E-SS-01 到以下在主要终端中的隔离器。也将包括电缆支持,终止,安装, 将人标为,被联系的附件和建造工作有必要提供完整的系统如指定和遵守相关的代码
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭