求翻译:Completely maximum limit optimizes each working procedure, each branch sub-item project.Next in view of the engineering project characteristic, plans besides the reasonable scene construction organization also must prepare for technology in the construction craft, specially these involve to the high technology and new 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Completely maximum limit optimizes each working procedure, each branch sub-item project.Next in view of the engineering project characteristic, plans besides the reasonable scene construction organization also must prepare for technology in the construction craft, specially these involve to the high technology and new
问题补充:

  • 匿名
2013-05-23 12:21:38
完全最大限度地优化各工序,针对工程项目特点的每个分支子项project.Next,计划除了合理的现场施工组织还必须在施工工艺进行技术准备,特别是那些涉及到高科技,新
  • 匿名
2013-05-23 12:23:18
完整地; 彻底地; 完全地
  • 匿名
2013-05-23 12:24:58
完全地最大限度优选每项办理手续,每个分支次级项目项目。其次由于工程学项目特征,计划除合理的场面建筑组织以外在建筑工艺必须也为技术,这些做准备特别地介入对高技术,并且新技术建筑工艺,一定能清楚地了解具体建筑工艺,在掌握期间,场面建设者能保证建筑过程每办理手续步,在心脏清楚地了解,为各种各样的方面突发的情况做准备处理方法,保证项目可能保证材料的质量准时完成。从技术角度出发,建筑质量问题是否达到了 交互作用设计请求和相关标准标准请求,牌子严密请求从建筑过程每办理手续是仅仅显然不足,必须完成技术力量,由于每项办理手续,每种建筑工艺特别细节提出另外技术处理标准,
  • 匿名
2013-05-23 12:26:38
完全地最大限度优化每一道工序、 每个分部分项工程。下一步考虑到工程项目的特点,除了合理的现场施工组织计划还必须准备在施工工艺技术,特别是那些涉及到的高新技术和新技术的施工工艺,必须能够清楚地了解混凝土施工工艺作为场景构造函数必须能够保证施工过程在抓取过程中的每个工作流程步骤在心里很清楚,锋利的情况处理计划,保证项目能保证质量的材料,按时完成各方面的准备。从技术角度出发,是否施工质量问题并实现相关的设计要求及相关标准标准要求,使从施工过程严格要求每道工序都是仅仅是远远不够的必须完成的科技力量,考虑到每一道工序、 每个施工工艺的特殊细节提出了不同的技术处理的标准,
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 