当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The process of estimating current cost profiles critically depends on assumptions made regarding inputs such as the specific technological components to be used, future costs for fuel stock procurement, connection distance to the power grid, and capacity load factor estimates, to name but a few malleable factors.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The process of estimating current cost profiles critically depends on assumptions made regarding inputs such as the specific technological components to be used, future costs for fuel stock procurement, connection distance to the power grid, and capacity load factor estimates, to name but a few malleable factors.
问题补充:

  • 匿名
2013-05-23 12:21:38
估计当前成本型材的方法,严重依赖于做出关于输入的假设,如特定技术组件中使用,用于燃料库存采购未来成本,对电网的连接距离,并且容量负载因子的估计,仅举几延展性
  • 匿名
2013-05-23 12:23:18
估计当期成本外形的过程危急地取决于关于输入被做的假定例如为燃料股票获得将用于的,未来费用具体技术组分,连接距离到电网和容量负载因数估计,名字,但是一些个展性的因素。
  • 匿名
2013-05-23 12:24:58
估计当期成本外形的过程重要地取决于关于输入被做的假定例如为燃料股票获得将用于的,未来费用具体技术组分,连接距离到功率网格和容量负载系数估计,名字,但几个展性的因素。
  • 匿名
2013-05-23 12:26:38
批判地估计当前的成本配置文件的过程取决于假设作出投入,例如特定的技术组件,用于、 燃料库存采购、 连接距离到电网和能力的未来费用负载因子估计可锻铸铁的几项因素。
  • 匿名
2013-05-23 12:28:18
批评地估计当前花去的简介的过程取决于被做出的假设关于输入例如有待使用的特定技术组件,对于燃料股票获得的将来费用,连接距离到力量格子,产量的负荷因素预计,命名但是一些有延展性的因素。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭