当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:These tasks now require a higher-level skilled design drafter who has an understanding of the project and the materials used. The costs associated with training and maintaining a skilled design modeler are higher than a draftsman with no knowledge of the trade. Some companies may even be compelled to stay out of the BI是什么意思?

待解决 悬赏分:1 - 离问题结束还有
These tasks now require a higher-level skilled design drafter who has an understanding of the project and the materials used. The costs associated with training and maintaining a skilled design modeler are higher than a draftsman with no knowledge of the trade. Some companies may even be compelled to stay out of the BI
问题补充:

  • 匿名
2013-05-23 12:21:38
这些任务现在需要一个更高级别的熟练设计起草谁拥有项目的理解和使用的材料。
  • 匿名
2013-05-23 12:23:18
这些任务现在需要有用于的对项目和材料的理解的一个高水平熟练的设计起草人。费用与训练和赡养一名熟练的设计模型工交往高于制图员没有贸易的知识。有些公司也许甚而被迫出去BIM世界一共由于BIM的定期和知识转让的本质。
  • 匿名
2013-05-23 12:24:58
这些任务现在需要有用于的对项目和材料的理解的一个高水平熟练的设计起草人。 费用与训练和赡养一名熟练的设计模型工交往制图员高于没有贸易的知识。 有些公司也许甚而被迫出去BIM世界一共由于BIM的时间和知识密集的本质。
  • 匿名
2013-05-23 12:26:38
这些任务现在要求更高层次的熟练的设计起草人有一个认识的项目和使用的材料。与培训和维护熟练的设计建模相关的成本均高于绘图员没有知识的贸易。一些公司甚至可能被迫远离 BIM 世界一共由于 BIM 的时间和知识密集性质。
  • 匿名
2013-05-23 12:28:18
这些任务现在需要较高层次有项目和被使用的材料的理解力的熟练的设计起草人。与训练和维持一个熟练的设计模仿人相关的费用是比有对贸易的没有知识的一位绘图师更高的。一些公司甚至可能被迫使由于 BIM 的时间和知识加强器自然完全避开 BIM 世界。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭