|
关注:1
2013-05-23 12:21
求翻译:A change to a BIM delivery process represents a big change to an existing CAD workflow and thus a change to individual employee roles. The biggest change is a move away from pure drafters. With the BIM process focused around building a project in the virtual environment, those who are interacting with the model require是什么意思? 待解决
悬赏分:1
- 离问题结束还有
A change to a BIM delivery process represents a big change to an existing CAD workflow and thus a change to individual employee roles. The biggest change is a move away from pure drafters. With the BIM process focused around building a project in the virtual environment, those who are interacting with the model require
问题补充: |
|
2013-05-23 12:21:38
改变到BIM交付过程代表了大的变化,以现有的CAD工作流程,从而改变以员工个人的作用。
|
|
2013-05-23 12:23:18
对BIM交付过程的变动代表对现有的CAD工作流的大变动和因而对各自的雇员角色的变动。最大的变动是远离纯净的起草人的移动。使用BIM处理聚焦在建立项目附近在真正环境,与模型互动要求更多商业知识是高效率的那些人。
|
|
2013-05-23 12:24:58
对BIM交付过程的变动代表对现有的CAD工作流的大变动和因而对各自的雇员角色的变动。 最大的变动是移动从纯净的起草人。 与BIM处理在建立项目附近聚焦在真正环境,与模型互动要求更多商业知识是高效率的那些人。
|
|
2013-05-23 12:26:38
对 BIM 交付过程的变化表示很大的改变现有的 CAD 工作流,从而给员工个人角色的变化。最大的变化是纯起草人离开。BIM 过程围绕着建筑虚拟环境中的工程,那些与模型进行交互的人需要更多的贸易知识,要有效。
|
|
2013-05-23 12:28:18
对一个 BIM 发送过程的一个变化代表对一项现有无赖工作流的一个大的变化,因此对单个雇员作用的一个变化。最大的变化是从纯起草人撤离。以环绕建造一个项目于虚拟的环境被聚焦的 BIM 过程,那些拿着模型在互相影响需要更多贸易知识是有效的。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区