求翻译:If the tunnel is excavated by conventional means, the excessive deformation will usually cause failure and damage to the primary support, requiring re-excavation to the original tunnel profile (due to the reduction in cross-section) and replacement of the support in the affected section.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
If the tunnel is excavated by conventional means, the excessive deformation will usually cause failure and damage to the primary support, requiring re-excavation to the original tunnel profile (due to the reduction in cross-section) and replacement of the support in the affected section.
问题补充:

  • 匿名
2013-05-23 12:21:38
如果该隧道是通过常规方式挖掘,过度变形通常会造成故障和损坏的主支撑,因此需要重新挖掘到原始隧道信息(由于截面的减少)和更换支撑体在受影响的
  • 匿名
2013-05-23 12:23:18
如果隧道通过常规手段挖掘,过份变形通常将造成失败和损伤对主要支持,要求支持的再挖掘对原始的隧道外形(由于减少对横断面)和替换在受影响的部分。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
如果隧道开挖的常规手段,将通常会引起过大的变形,故障和损坏的主要支持,需要重新开挖到原始隧道配置文件 (由于在截面减少) 和更换受影响的部分中的支持。
  • 匿名
2013-05-23 12:28:18
如果隧道被传统的手段挖掘,极度的变形通常将导致对最初支持的故障和损害,需要重新挖掘到原始隧道简介 ( 由于缩减在把分割成截面 ) 和在被影响的部分中的支持的替代。
 
 