当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:ƒIn traditional 2D design processes, design coordination between trades is expected and required to ensure constructability; however, the means and methods of installation are generally left to the constructors to coordinate between trades and finalize routing of ductwork, cable trays, conduits, etc. Coordination drawi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
ƒIn traditional 2D design processes, design coordination between trades is expected and required to ensure constructability; however, the means and methods of installation are generally left to the constructors to coordinate between trades and finalize routing of ductwork, cable trays, conduits, etc. Coordination drawi
问题补充:

  • 匿名
2013-05-23 12:21:38
??在传统的二维设计流程,行业之间的协同设计,预计和要求,确保施工性;
  • 匿名
2013-05-23 12:23:18
ƒ在传统第2个设计过程中,在贸易之间的设计协调预计并且要求保证constructability;然而,设施手段和方法通常留下给对座标的建设者在贸易之间并且完成通风管、电缆托盘、输送管道等等协调图画发送从建设者经常需要。
  • 匿名
2013-05-23 12:24:58
ƒ在传统第2个设计过程中,设计协调在贸易之间预计并且要求保证constructability; 然而,设施手段和方法一般留下给建设者到座标在贸易之间并且完成通风管、缆绳盘子、输送管道等等发送。 协调图画从建设者经常需要。 运用BIM技术,设计小组在模型比传统模型去极大地进一步通过协调以其他贸易和定义更多数据。 风险和责任挑战: 注意标准是否成为更加复杂的下面BIM ? 设计小组是否假设更加巨大的责任为大厦系统的constructability ? 有希望地建造者将遇到少量领域协调问题,但,当他们发生,建设者是否是否安排一个更低的注意标准和较少责任假设协调的负担转移了往设计阶段?
  • 匿名
2013-05-23 12:26:38
在传统的二维设计过程中,设计行业之间的协调是期望和要求,确保可施工性 ;然而,安装方法与手段通常留给构造函数行业之间进行协调,并最后确定路由的管道系统、 电缆桥架、 管道等。协调图纸往往要求从构造函数。利用 BIM 技术,设计团队就极大地进一步比传统模型与其他行业协调,并在模型中定义更多的数据。风险和责任方面的挑战: 做护理变得更加复杂下 BIM 的标准吗?设计团队并承担更大的责任,在建设系统的可施工性吗?希望建设者们将会遇到更少领域协调问题,但当他们出现,做构造函数较低的保健标准和负债较少考虑到协调的负担已经转向设计阶段呢?
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭