求翻译:Clash detection. Traditionally design drawings must be coordinated to assure that different building systems do not clash and can actually be constructed in the allowed space. Accordingly, most clashes are identified when the contractor receives the design drawings and everyone is on-site and working. With clashes bein是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Clash detection. Traditionally design drawings must be coordinated to assure that different building systems do not clash and can actually be constructed in the allowed space. Accordingly, most clashes are identified when the contractor receives the design drawings and everyone is on-site and working. With clashes bein
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
碰撞侦查。传统上设计图必须协调保证不同的大厦系统在允许的空间不撞击并且可能实际上被修建。相应地,多数碰撞被辨认,当承包商接受设计图时,并且大家是本地和工作。当碰撞那么后被查出,延迟导致,并且决定需要非常迅速做出为了提供解答。
  • 匿名
2013-05-23 12:24:58
碰撞侦查。 必须传统上协调设计图保证不同的大厦系统在允许的空间不撞击并且可能实际上被修建。 相应地,多数碰撞被辨认,当承包商接受设计图时,并且大家是本地和工作。 当碰撞那么后被查出,延迟导致,并且决定需要非常迅速做出为了提供解答。 在建筑开始之前, BIM及早在设计阶段使潜在问题辩认和被解决。 说明BIM的好处,一个项目为一般服务管理在美国锯BIM式样评论者发现257个constructability问题和7,213种冲突。 在同一个项目,传统计划评论者发现了六个constructability问题和一种冲突。
  • 匿名
2013-05-23 12:26:38
碰撞检测。传统设计图纸必须互相协调,以保证不同的建筑系统并不冲突,实际上可以在允许的空间构造。因此,大多数冲突被确定在承建商接收的设计图纸时,每个人都是现场和工作。这么晚才被检测到的冲突,导致延迟,需要提供一个解决方案非常迅速的决定。BIM 使潜在的问题,应在设计阶段的早期查明和解决施工开始之前。为在美国服务总局的一个项目说明 BIM 的优势,看到 BIM 模型审阅者找到 257 可施工性问题和 7,213 的冲突。在同一项目中,传统的计划审阅者发现六个可施工性问题和一个冲突。