当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Attached please find the information you will need to determine the placement of the cable conduits. Please note that the electrical room location has a TBD (to be determined) location. Please make sure that the conduits that need to go to these rooms are routed to the final location of the electrical room.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Attached please find the information you will need to determine the placement of the cable conduits. Please note that the electrical room location has a TBD (to be determined) location. Please make sure that the conduits that need to go to these rooms are routed to the final location of the electrical room.
问题补充:

  • 匿名
2013-05-23 12:21:38
随函附上的信息,您将需要确定位置的电缆管道。
  • 匿名
2013-05-23 12:23:18
附有请找出信息您将需要确定缆绳输送管道的安置。请注意:电子室地点有一个TBD (将确定)地点。请切记需要去这些房间的输送管道寻址到电子屋子的最后的地点。
  • 匿名
2013-05-23 12:24:58
附有请找出信息您将需要确定缆绳输送管道的安置。 请注意:电子室地点有TBD (是被确定的) 地点。 请切记需要去这些房间的输送管道寻址到电子屋子的最后的地点。
  • 匿名
2013-05-23 12:26:38
随函附上您将需要确定电缆导管位置的信息。请注意电气室位置待定 (待定) 的位置。请确保需要去这些房间的管道被路由到最终位置的电气室。
  • 匿名
2013-05-23 12:28:18
附加请发现信息你将需要确定电缆渠道的放置。请注意:电房间位置有一 TBD( 被确定 ) 位置。请确保需要去这些房间的渠道被传送到电房间的最后位置。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭