求翻译:During the technical clarification on the route map from the owner, the cable way and cable car were deleted, DREDGING, WATER SOURCE WELL, HIGH LEVEL WTER TANK, were detailed in the orginal plan (overhead Route map clarification from the owner of 13.8kv distribution line是什么意思?

待解决 悬赏分:1 - 离问题结束还有
During the technical clarification on the route map from the owner, the cable way and cable car were deleted, DREDGING, WATER SOURCE WELL, HIGH LEVEL WTER TANK, were detailed in the orginal plan (overhead Route map clarification from the owner of 13.8kv distribution line
问题补充:

  • 匿名
2013-05-23 12:21:38
在路线图从所有者的技术交底,对索道和缆车被删除,疏浚,水源井, HIGH LEVEL WTER TANK ,在最初的计划进行了详细的(间接路线图从13.8KV分布的所有者澄清
  • 匿名
2013-05-23 12:23:18
在路线图的技术阐明时从所有者,缆道和缆车在原始的计划(从13.8kv发行线所有者的顶上的路线图阐明被删除了,很好清疏,水源,高级WTER坦克,详述了
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
期间从所有者路线地图的技术澄清,电缆和电缆车被删除,在原始计划详细介绍疏浚、 水井源、 高水平水土坦克,(架空路线地图澄清从所有者 ~ 13.8 k v 的配电线路
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 