求翻译:With central drift method in construction, after the excavation of left tube upper bench, loose zone of inverted arch in the left tube and the formation of the central drift which has been excavated area overlapping to form an organic whole, slide easily happened bias, be sure to strengthen monitoring measurement, when是什么意思?

待解决 悬赏分:1 - 离问题结束还有
With central drift method in construction, after the excavation of left tube upper bench, loose zone of inverted arch in the left tube and the formation of the central drift which has been excavated area overlapping to form an organic whole, slide easily happened bias, be sure to strengthen monitoring measurement, when
问题补充:

  • 匿名
2013-05-23 12:21:38
中央导坑法施工,左筒上部板凳,仰拱的左侧管松动区,已挖掘区域重叠,形成一个有机的整体,中央漂移形成的开挖后,幻灯片极易发生偏差,会
  • 匿名
2013-05-23 12:23:18
中央漂泊方法在建筑,在左管上部长凳的挖掘以后,被倒置的曲拱宽松区域在左管的和是重叠被挖掘的区域形成一个有组织的整体中央漂泊的形成,滑容易地发生倾斜,是肯定加强监视测量,当隧道中间墙壁重音价值的建筑是10.3 MPa。
  • 匿名
2013-05-23 12:24:58
以中央漂泊方法在建筑,在左管上部长凳的挖掘以后,被倒置的曲拱宽松区域在左管和有是被挖掘的区域重叠形成一个有组织的整体中央漂泊的形成,滑容易地发生倾斜,是肯定加强监视测量,当隧道中间墙壁重音价值的建筑是10.3 MPa。
  • 匿名
2013-05-23 12:26:38
中心漂移法在施工中,左的管上部的长椅上,仰拱左管松动及已挖掘的区中心漂移成因的发掘后重叠,形成一个有机的整体,幻灯片很容易发生偏差,一定要加强监控量测,当隧道中墙应力值的建设是 10.3 MPa。
  • 匿名
2013-05-23 12:28:18
以在建造中的中央漂流物方法,在左边管子的挖掘之后上层的长凳,在左边管子和被挖掘了的中央漂流物的构成中的转化的拱的松弛的区域重叠形成一个组织的整体的面积的重叠,滑动容易被发生的偏见,在隧道中间墙压力价值的建造是 10.3 MPa 时,确保加强监测测量。
 
 