|
关注:1
2013-05-23 12:21
求翻译:With central drift method in construction, after the excavation of left tube upper bench, the loose zone of inverted arch in the left hole and the formation of the central drift which has been excavated area overlapping to form an organic whole, slide easily happened , be sure to strengthen monitoring measurement, when是什么意思?![]() ![]() With central drift method in construction, after the excavation of left tube upper bench, the loose zone of inverted arch in the left hole and the formation of the central drift which has been excavated area overlapping to form an organic whole, slide easily happened , be sure to strengthen monitoring measurement, when
问题补充: |
|
2013-05-23 12:21:38
中央导坑法施工,左筒上部板凳开挖后,仰拱的左侧孔松区,已挖掘区域重叠,形成一个有机的整体,中央漂移的形成,滑极易发生,是
|
|
2013-05-23 12:23:18
中央漂泊方法在建筑,在左管上部长凳的挖掘以后,被倒置的曲拱宽松区域在左孔的和是重叠被挖掘的区域形成一个有组织的整体中央漂泊,幻灯片的形成容易地发生了,是肯定加强监视测量,当隧道中间墙壁重音价值的建筑是10.3 MPa。
|
|
2013-05-23 12:24:58
以中央漂泊方法在建筑,在左管上部长凳的挖掘,被倒置的曲拱宽松区域在左孔和有是被挖掘的区域重叠形成一个有组织的整体中央漂泊的形成以后,幻灯片容易地发生了,是肯定加强监视测量,当隧道中间墙壁重音价值的建筑是10.3 MPa。
|
|
2013-05-23 12:26:38
与中心漂移法在施工,左的管上台阶开挖、 松动圈的仰拱左洞和中心的漂移,已形成开挖区域重叠,形成一个有机的整体,幻灯片容易发生后, 务必加强监控量测,当隧道中墙应力值的建设是 10.3 MPa。
|
|
2013-05-23 12:28:18
以在建造中的中央漂流物方法,在左边管子的挖掘之后上层的长凳,在左边孔和被挖掘了的中央漂流物的构成的转化的拱的松弛的区域重叠形成一个组织的整体的面积的重叠,滑动容易发生,在隧道中间墙压力价值的建造是 10.3 MPa 时,确保加强监测测量。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区