当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Index1 values the security of the system and the Index2 values the economy of the system when scenario s is selected. As the generation scheduling of thermal unit is determined based on the system load given beforehand and the wind power given by forecasted data which may have big difference with the practical situ是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Index1 values the security of the system and the Index2 values the economy of the system when scenario s is selected. As the generation scheduling of thermal unit is determined based on the system load given beforehand and the wind power given by forecasted data which may have big difference with the practical situ
问题补充:

  • 匿名
2013-05-23 12:21:38
在索引1值的系统的安全性和索引2值的系统的经济性的情况s被选择时。
  • 匿名
2013-05-23 12:23:18
Index1重视系统的安全,并且Index2重视系统的经济,当情景s被选择时。当一代预定热单位根据系统负载予先指定的和也许有大区别以实用情况的展望的数据给的风力是坚定的,必需的系统负载可能不是满意的,如果风力产品被过高估计。并且Index1根据这个案件被定义。
  • 匿名
2013-05-23 12:24:58
Index1重视系统的安全,并且Index2重视系统的经济,当情景s被选择时。 因为根据系统负载予先指定和风力热单位是坚定的世代预定给由也许有大区别以实用情况的展望的数据,必需的系统负载可能不是满意的,如果风力产品被过高估计。 并且Index1被定义根据这个案件。 Index2重视系统的运作费,并且Sce s分子() 代表可能性的冲击。 情景与最高的Sce( s) 被选择作为风力产品的表示法。 并且最后电力发动预定达到根据选择的情景的依据。
  • 匿名
2013-05-23 12:26:38
Index1 值系统的安全性和 Index2 值系统的经济性,在场景中 s 处于选中状态。作为基于系统负荷给出事前与风力发电给出的预测数据,可能会有大的差别,与实际情况,确定了火电机组发电计划,所需的系统负载可能不能满足,如果风功率输出高估了。Index1 基于这种情况下定义。Index2 值系统的营运成本和 Sce(s) 分子代表概率的影响。与最高的 Sce(s) 方案被选定为风电场输出功率的表示形式。并在选定的方案的基础上取得了最后的功率发电计划。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭