当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In the ZK72 + 755 section, level convergence, vault subsidence , inverted arch settlement prediction is 15.97 mm, 5.35 mm and 18.5 mm respectively; Numerical simulation software value were 13.0 mm and 3.2 mm and 13.7 mm; Through the field monitoring measurement, ZK72 + 755 section of the measured values is 16.7 mm, 5.5是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In the ZK72 + 755 section, level convergence, vault subsidence , inverted arch settlement prediction is 15.97 mm, 5.35 mm and 18.5 mm respectively; Numerical simulation software value were 13.0 mm and 3.2 mm and 13.7 mm; Through the field monitoring measurement, ZK72 + 755 section of the measured values is 16.7 mm, 5.5
问题补充:

  • 匿名
2013-05-23 12:21:38
在ZK72 + 755段,水平收敛,拱顶下沉,仰拱沉降预测是15.97毫米,5.35毫米和​​18.5毫米;
  • 匿名
2013-05-23 12:23:18
在ZK72 + 755区分,平实汇合,穹顶沉淀,被倒置的曲拱解决预言是各自15.97 mm、5.35 mm和18.5 mm;数值仿真软件价值是13.0 mm和3.2 mm和13.7 mm;通过领域监视测量, ZK72 +第755部分测量值的分别为16.7 mm、5.5 mm和17.4 mm。
  • 匿名
2013-05-23 12:24:58
在ZK72 + 755区分,平实汇合,穹顶沉淀,被倒置的曲拱解决预言是各自15.97毫米、5.35毫米和18.5毫米; 数值仿真软件价值是13.0毫米和3.2毫米和13.7毫米; 通过领域监视测量, ZK72 +第755部分测量值的分别为16.7毫米、5.5毫米和17.4毫米。 预言的等式,因此,是紧挨测量值,能被看见,灰色GM (1, 1个) 模型可能准确地模仿时间序列,预言准确性的周围的岩石位移到达了隧道安全建筑的要求; 数值测量值小于,但整体趋向一致与测量值,实际建筑,关于得到关键设计的周围的岩石危险地带的数值仿真的建议,加强如果必要,与灰色预测模型结合,可以是周围的岩石的方便,准确预言
  • 匿名
2013-05-23 12:26:38
在 ZK72 + 755 节,水平收敛,拱顶沉降颠倒拱沉降预测是 15.97 毫米、 5.35 毫米和 18.5 毫米分别为何 ;数值模拟软件价值被 13.0 毫米和 3.2 毫米和 13.7 毫米 ;通过实地监测测量,ZK72 + 755 条测量值分别为 16.7 毫米,5.5 毫米和 17.4 毫米。方程来预测,因此,是接近实测值,可以看出,灰色 GM (1,1) 模型可以准确地模拟围岩位移时间序列预测精度均达到了要求的隧道安全施工 ;数值小于实测值,但一致值与实测值,实际施工中,数值模拟方法的建议,以获得危险区的设计的关键,加强在必要时,围岩的整体趋势结合的灰色预测模型,可以方便、 准确
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭