求翻译:The swan multi-arch tunnel vault subsidence, horizontal convergence and inverted arch sedimentation stability displacement are: 15 mm, 5 mm and 17 mm, stable time required for about 35 days. Vault subsidence and inverted arch sedimentation value is bigger. At the beginning of the contact pressure of surrounding rock an是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The swan multi-arch tunnel vault subsidence, horizontal convergence and inverted arch sedimentation stability displacement are: 15 mm, 5 mm and 17 mm, stable time required for about 35 days. Vault subsidence and inverted arch sedimentation value is bigger. At the beginning of the contact pressure of surrounding rock an
问题补充:

  • 匿名
2013-05-23 12:21:38
天鹅多连拱隧道拱顶下沉,水平收敛和仰拱沉降稳定性排量是15毫米,五毫米和17毫米,需要35天左右的时间稳定。
  • 匿名
2013-05-23 12:23:18
天鹅多曲拱隧道穹顶沉淀、水平的汇合和被倒置的曲拱沉积作用稳定位移是:15 mm、5 mm和17 mm,大约35天的稳定的需时。穹顶沉淀和被倒置的曲拱沉降值是更大的。
  • 匿名
2013-05-23 12:24:58
天鹅多曲拱隧道穹顶沉淀、水平的汇合和被倒置的曲拱沉积作用稳定位移是: 15毫米、5毫米和17毫米,大约35天的稳定的需时。 穹顶沉淀和被倒置的曲拱沉降值是更大的。 在周围的岩石和衬里初联络压力基本与限制的推进,监视一起逐渐增加在挖掘大约35天,压力价值倾向于是稳定的,左spandrel重音用一定数量基本它大于正确的spandrel。
  • 匿名
2013-05-23 12:26:38
天鹅连拱隧道拱顶沉降、 水平收敛、 倒拱沉降稳定性位移是: 15 毫米、 5 毫米和 17 毫米,稳定所需的大约 35 天的时间。拱顶沉降和倒拱沉淀值越大。在开始接触压力的围岩和衬砌基本逐渐增加和提高地位的制约因素,在基坑开挖监测大约 35 天,压力值趋于稳定,基本数目的左的拱应力大于右拱。
  • 匿名
2013-05-23 12:28:18
天鹅多拱隧道拱顶 subsidence,水平集中和使拱转化 sedimentation 稳定性代替是:15 毫米, 5 毫米和 17 毫米,稳定的时间大约 35 天来要求。拱顶 subsidence 和使拱转化 sedimentation 价值是更大的。在周围的岩石的联系压力的开始以及逐渐地沿着基本原理排成行连同约束的进步的增长,在挖掘大约 35 天的监测,压力价值有助于是稳定的,左边 spandrel 压力在一些它大于的基本原理正确的 spandrel。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭