求翻译:For a long time, construction cost control of the preliminary engineering of project construction has been ignored in China, while the primary energy of controlling construction cost has been focused upon auditing working drawing estimate, settling construction cost and settling itemized account during construction.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
For a long time, construction cost control of the preliminary engineering of project construction has been ignored in China, while the primary energy of controlling construction cost has been focused upon auditing working drawing estimate, settling construction cost and settling itemized account during construction.
问题补充:

  • 匿名
2013-05-23 12:21:38
在很长一段时间,项目建设的前期工程施工成本控制已经忽略了在中国,而控制工程造价的主要精力一直集中在审核施工图预算,解决建设成本和施工过程中解决流水帐。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
长期,而控制建筑费主要能源被聚焦了在验核加工图估计,安定的建筑费和安定被分条列述的帐户在建筑期间,项目建筑初步工程学的建筑费控制在中国被忽略了。
  • 匿名
2013-05-23 12:26:38
在很长的时间,已被施工成本控制项目建设的初步工程在中国,忽略,而绘图估计、 沉降工程造价和施工过程中沉降明细账的审计工作所聚焦的工程造价控制的主要能源。
  • 匿名
2013-05-23 12:28:18
很久,对初步工程的建造费用控制项目建造中在中国被忽略了,而控制建造费用的最初能量在审查工作素描估计,确定建造费用,在建造期间确定被逐条列出的帐户上被聚焦了。
 
 