|
关注:1
2013-05-23 12:21
求翻译:There was the potential for the electrical noise issues, but due to the isolation of BCM the noise will remain close to the load. A filter on the input of the ZVS Buck Regulators will be needed, the design of which would be finalized after taking measurements on the prototype.是什么意思?![]() ![]() There was the potential for the electrical noise issues, but due to the isolation of BCM the noise will remain close to the load. A filter on the input of the ZVS Buck Regulators will be needed, the design of which would be finalized after taking measurements on the prototype.
问题补充: |
|
2013-05-23 12:21:38
有对电噪声的问题的潜力,但由于BCM的隔离噪声仍将靠近负载。
|
|
2013-05-23 12:23:18
有在电子噪声问题的潜力,但是由于BCM的隔离噪声将依然是接近装载。在ZVS大型装配架管理者的输入的过滤器将是需要的,设计在采取在原型的测量以后将被完成。
|
|
2013-05-23 12:24:58
有在电子噪声问题的潜力,但由于BCM的隔离噪声将依然是紧挨装载。 过滤器在ZVS大型装配架管理者的输入将是需要的,设计,其中在采取测量以后将被完成在原型。
|
|
2013-05-23 12:26:38
有了电噪音问题,但由于 BCM 噪音将保持负载隔离的潜力。将需要 ZVS 降压变换器的输入筛选器,其设计将考虑测量样机上后才定稿。
|
|
2013-05-23 12:28:18
有对电噪音来说的潜力发行,但是由于 BCM 的隔绝噪音将接近负荷。在 ZVS Buck 管理者的输入上的一个过滤器将需要,对哪个会在原型上进行测量之后被完成的设计。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区