当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:At present the solution for this difficult problem hengyuan power plant cost control is mostly based on the cost control to achieve.This article mainly through in recent years the correlation data as well as this power plant present situation analyzed the question to this power plant which this power plant exists at pr是什么意思?

待解决 悬赏分:1 - 离问题结束还有
At present the solution for this difficult problem hengyuan power plant cost control is mostly based on the cost control to achieve.This article mainly through in recent years the correlation data as well as this power plant present situation analyzed the question to this power plant which this power plant exists at pr
问题补充:

  • 匿名
2013-05-23 12:21:38
目前这个难题恒源电厂的成本控制解决方案主要是基于成本控制achieve.This文章主要是通过近几年的相关数据,以及该电厂目前的情况分析,这个问题该电厂此
  • 匿名
2013-05-23 12:23:18
在...地点; 向, 对着, 朝; 在...时刻; 在...方面#奥地利
  • 匿名
2013-05-23 12:24:58
解答为这困难的问题hengyuan能源厂成本控制根据成本控制主要当前达到。这篇文章主要通过交互作用数据以及这能源厂当前的形式近年来分析了问题对这个能源厂当前存在的这个能源厂,并且提出了对应的解答措施。减少产品的费用,新的能源的发展,以新的能量替换能量控制产品的费用和促进控制植物的费用。这些方法更加容易地必须,并且费用是低的,但有一些限制,根据当前经济形势是难实施, 设备不是完全的。
  • 匿名
2013-05-23 12:26:38
目前解决这个难题恒源电厂,成本控制是大多是基于成本控制是实现。本文主要通过近年来的相关数据,以及这一电厂现状分析到这座发电厂的这座发电厂位于问题目前,并提出了相应的解决措施。降低成本的产品,发展新能源与新能源替代能源来控制成本的产品,并进一步控制工厂的成本。这些方法更容易,不得不和成本较低,但也有一些局限性,根据当前经济形势很难实施,设备不齐全。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭