|
关注:1
2013-05-23 12:21
求翻译:In modern systems, however, voltages are frequently low, currents high and power must be distributed widely. The I2R power loss in the busses becomes unmanageable, requiring impractically large bus cross-sections. With all aspects of the power conversion located at some distance from the load, the ability of CPA system是什么意思?![]() ![]() In modern systems, however, voltages are frequently low, currents high and power must be distributed widely. The I2R power loss in the busses becomes unmanageable, requiring impractically large bus cross-sections. With all aspects of the power conversion located at some distance from the load, the ability of CPA system
问题补充: |
|
2013-05-23 12:21:38
在现代系统,但是,电压经常偏低,电流大和功率必须分布广泛。
|
|
2013-05-23 12:23:18
在现代系统,然而,电压常常地是低的,潮流上流,并且必须广泛分布力量。I2R功率损失在公共汽车上变得无法处理,要求不切实际大公共汽车横断面。能量变换的所有方面位于从装载的某一距离, CPA系统的能力反应瞬变力量要求是严重有限的。
|
|
2013-05-23 12:24:58
在现代系统,然而,电压频繁地是低的,潮流上流,并且必须广泛分布力量。 I2R功率损失在公共汽车上变得无法处理,要求不切实际大公共汽车横断面。 以力量转换的所有方面位于从装载的某一距离, CPA系统的能力反应瞬变力量要求是严重有限的。
|
|
2013-05-23 12:26:38
在现代系统中,然而,电压是频繁地低,高和电源的电流必须广泛分发。I2R 功耗的公交车变得难于管理,要求不切实际大型客车截面。位于一些载荷的距离转换电源的所有方面,注册会计师系统对暂态电能要求作出回应的能力却非常有限。
|
|
2013-05-23 12:28:18
在现代系统中,然而,电压低经常是流高和力量必须广泛地被分散。在 busses 的 I2R 断电成为不易处理,要求非几乎大公共汽车把分割成截面。以力量转换的所有方面距一些距离负荷,应答短暂力量的 CPA 系统的能力要求严重地被限制。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区