当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:5. Rates for concrete shall include for cutting or forming all grooves, chases,recesses, notches, holes, mortises, pockets, stop ends, construction joints,working around pipes, ducts and obstructions, casting in fixing blocks, hangers all projections, keys , and other labours of a like nature required.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
5. Rates for concrete shall include for cutting or forming all grooves, chases,recesses, notches, holes, mortises, pockets, stop ends, construction joints,working around pipes, ducts and obstructions, casting in fixing blocks, hangers all projections, keys , and other labours of a like nature required.
问题补充:

  • 匿名
2013-05-23 12:21:38
5.价格的具体应包括切割或形成的所有凹槽,追逐,凹槽,凹槽,孔,榫眼,口袋,停止两端,施工缝,围绕管道,管道和障碍物的工作,铸造固定块,衣架都预测,钥匙
  • 匿名
2013-05-23 12:23:18
5. 混凝土的率为削减或形成所有凹线将包括,追逐,凹进处,山谷,孔,榫眼,口袋,中止末端,建筑联接,运作在管子,输送管和阻碍附近,熔铸在定象块、挂衣架所有投射,钥匙和a其他劳方象需要的自然的。
  • 匿名
2013-05-23 12:24:58
5. 率为混凝土为切口或形成所有凹线将包括,追逐,凹进处,山谷,孔,榫眼,口袋,中止末端,建筑联接,运作在管子,输送管和阻碍附近,熔铸在定象块、挂衣架所有投射,钥匙和a其他劳方象需要的自然。
  • 匿名
2013-05-23 12:26:38
5.率混凝土应包括切割或成型槽、 追逐、 凹进处、 凹槽、 孔、 无数,口袋,停止结束,施工缝工作围绕管、 导管和障碍物,铸造在固定块,衣架所有预测,钥匙,,并且其他类似性质的劳动所需。
  • 匿名
2013-05-23 12:28:18
5.混凝土的比率将包括用于裁减或形成所有最佳状态,奔跑,休会,开槽,打洞,接榫眼,口袋,停止终端,建造关节,环绕烟斗,管道和障碍物工作,在固定街区方面投掷,衣架所有投影,钥匙,其他劳作像需要的自然一样。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭