当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:For this purpose the cut tube arcs were first covered manually with the deposits and after being placed in the ceramic dish, they were positioned in the laboratory furnace to the corresponding gas atmosphere at 650°C.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
For this purpose the cut tube arcs were first covered manually with the deposits and after being placed in the ceramic dish, they were positioned in the laboratory furnace to the corresponding gas atmosphere at 650°C.
问题补充:

  • 匿名
2013-05-23 12:21:38
出于这个目的,首先手动覆盖有存款和被放置在所述陶瓷盘之后的切割管的弧,他们被放置在实验室炉中在650℃的相应气体气氛。
  • 匿名
2013-05-23 12:23:18
为此裁减管弧用储蓄手动地首先盖了,并且在安置在陶器以后,他们在实验室里对对应的气体大气的熔炉被安置了在650°C。
  • 匿名
2013-05-23 12:24:58
对这个目的削减管子使成弧手动首先随着储存被覆盖和被放到陶瓷菜中后,他们在 650 ° C 在到相应气体空气的实验室熔炉被放置。
  • 匿名
2013-05-23 12:26:38
为此目的,切的管弧首先覆盖,而手动后被放置在陶瓷盘与存款,他们被放置在实验室炉到相应的气体大气在 650 ° c。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭