|
关注:1
2013-05-23 12:21
求翻译:The parking lot, technical rooms and archives were placed below ground at level minus 1. The ground level is composed of reception area, conference rooms, multifunctional spaces and offices. Office spaces have also been placed on the above ground levels.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The parking lot, technical rooms and archives were placed below ground at level minus 1. The ground level is composed of reception area, conference rooms, multifunctional spaces and offices. Office spaces have also been placed on the above ground levels.
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
停车场、技术屋子和档案被安置了地下在减1.的水平。底层由接纳地区、会议室、多功能空间和办公室组成。办公室空间在上面底层上也被安置了。
|
|
2013-05-23 12:24:58
停车场、技术屋子和档案被安置了地下在水平减1。 底层由招待会区域、会议室、多功能空间和办公室组成。 办公室空间在上述底层上也被安置了。
|
|
2013-05-23 12:26:38
停车场、 技术室和档案被置于下方地面一级减 1。地面水平由接待区、 会议室、 多功能空间和办事处组成。办公空间亦对上述的地面水平放置。
|
|
2013-05-23 12:28:18
停车场,技术房间和存档在水平的短处在地下面被放置 1。地水平由招待会地区,会议室,多实用空间和办公室组成。办公室留间隔也放置上在地面上变平。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区