|
关注:1
2013-05-23 12:21
求翻译:The substructure also needed to be built with special attention. Mainly, the slope of the wall needed to secure that the proper flow of the water will be sustained.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The substructure also needed to be built with special attention. Mainly, the slope of the wall needed to secure that the proper flow of the water will be sustained.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区