求翻译:Fig. 2 demonstrates the public engagement process of a redevelopment project of the old airport site in Hong Kong – the Kai Tak Development. The original draft Outline Zoning Plans (OZPs) attracted strong opposition on a large scale to land reclamation involved in the development. A new feasibility study was then relau是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Fig. 2 demonstrates the public engagement process of a redevelopment project of the old airport site in Hong Kong – the Kai Tak Development. The original draft Outline Zoning Plans (OZPs) attracted strong opposition on a large scale to land reclamation involved in the development. A new feasibility study was then relau
问题补充:

  • 匿名
2013-05-23 12:21:38
图。
  • 匿名
2013-05-23 12:23:18
图2在香港展示老机场站点的重建计划的公开订婚过程– Kai达发展。原始的纲要草案分区制大规模地计划(OZPs)被吸引的强烈反对对在发展介入的开垦荒地。新的可行性研究在1999年11月然后被重新开办开发一个主要发展计划,跟随由参与公众初步布局计划。
  • 匿名
2013-05-23 12:24:58
。 2在香港展示老机场站点的再开发项目的公开订婚过程- Kai Tak发展。 原物草稿概述分区制大规模地 (计划) OZPs被吸引的强烈反对到在发展介入的开垦荒地。 新的可行性研究在1999年11月然后被重新开办开发一个主要发展计划,跟随由订婚公众初步布局计划。 随后, 2001年一套修改过的分区的计划由市镇计划委员会修正,并且以后在July2002 gazetted。
  • 匿名
2013-05-23 12:26:38
图 2 演示了 — — 在启德发展 Hong 本港启德机场旧址重建项目的公众参与过程。分区计划大纲草图 (大纲) 的原始草案吸引了大规模土地复垦参与发展的的强烈反对。一项新的可行性研究然后重新推出了在 1999 年 11 月制定总发展计划,其后在初步布局规划中的公众参与。随后,一套经修订的分区计划是在 2001 年修订,城市规划委员会 (城规会和 July2002 稍后于宪报刊登。
  • 匿名
2013-05-23 12:28:18
无花果。2 在香港显示老机场地点的一个再发展项目的公共约定过程 - Kai Tak 发展。将计划分区的原始草稿要点 ( OZPs ) 大规模地吸引强有力的反对党到开垦荒地涉及发展。一项新可行性研究然后在 1999 年 11 月被重新发动制定优秀发展的计划,接着是在初步布局计划中从事公众。随后,一套修订分区计划在 2001 年被城镇规划董事会修改及较迟在 July2002 中刊登。
 
 