当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The configuration of the experimental system is shown in Fig. 6. The experimental set up is composed of a PV panel connected to an electronic load through a PWM boost converter. The rated output power of the PV array is 300 W which consist of six series PV modules (Fuji Electric Co. ELR-615-160Z, 50 W) shown in Fig. 7.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The configuration of the experimental system is shown in Fig. 6. The experimental set up is composed of a PV panel connected to an electronic load through a PWM boost converter. The rated output power of the PV array is 300 W which consist of six series PV modules (Fuji Electric Co. ELR-615-160Z, 50 W) shown in Fig. 7.
问题补充:

  • 匿名
2013-05-23 12:21:38
实验系统的结构图。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
实验系统的配置,如图 6 所示。实验的设置被由连接到电子负载通过 PWM 升压转换器的光伏面板。额定的输出功率的光伏阵列是 300 W 图 7 中所示的六大系列光伏模块 (富士电机有限公司 ELR-615-160Z,50 W) 组成。一条腿的 6 中 1 智能功率模块 (IPM) 用作升压转换器。IPM 开关器件的开关信号是由数字信号处理器 (DSP) 生成的。TMS320LF2407A DSP 数字控制平台实施以获得控制和 PWM 功能通过最大化输出功率的软件。DSP 实现复杂控制算法和控制 boost 变换器切换根据控制算法,从而使输出功率可以跟踪在每个采样时刻的最大力量。输出电流和电压升
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭