当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:3.2.1one (1) set of high temperature, high pressure, single drum CFB boiler and accessories. The arrangement of boiler shall be the tighten closed arrangement (indoor type with steel construction covered insulation materials and cladding) and boiler house (by steel structure) is necessary for this project.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3.2.1one (1) set of high temperature, high pressure, single drum CFB boiler and accessories. The arrangement of boiler shall be the tighten closed arrangement (indoor type with steel construction covered insulation materials and cladding) and boiler house (by steel structure) is necessary for this project.
问题补充:

  • 匿名
2013-05-23 12:21:38
3.2.1one ( 1 )设定的高温,高压,单钢轮CFB锅炉及配件。
  • 匿名
2013-05-23 12:23:18
3.2.1one (1)套高温,高压,唯一鼓CFB锅炉和辅助部件。锅炉的安排将是拉紧结束的安排(与钢建筑报道的绝缘材料和金属的室内类型),并且锅炉房(由钢结构)为这个项目是必要的。
  • 匿名
2013-05-23 12:24:58
3.2.1one (1) 套高温度、高压、唯一鼓CFB锅炉和辅助部件。 锅炉的安排将是拉紧被关闭的安排 (室内类型与钢建筑报道的绝缘材料,并且金属) 和锅炉房 (由钢结构) 为这个项目是必要的。
  • 匿名
2013-05-23 12:26:38
3.2.1one (1) 套的高温、 高压、 单鼓循环流化床锅炉和配件。锅炉的安排应绷紧闭安排 (室内钢结构覆盖保温材料与熔覆型) 和锅炉房 (通过钢结构) 是这一项目的必要条件。
  • 匿名
2013-05-23 12:28:18
3.2.1one(1) 高一套温度,高压,单一鼓 CFB 锅炉和附件。锅炉的安排将是拉紧封闭的安排 ( 对钢铁建造的室内类型包括绝缘材料和覆层 ) 和锅炉房子 ( 在钢铁结构旁边 ) 对这个项目必要。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭