求翻译:Pre-Building: The supplier may pre-build high running skus with approval of the Hong Kong team. This should be used to help level load production and accommodate production efficiency. Pre-building should not exceed 30 days of the 90 day material quantity so as not to reduce the supplier’s ability to be flexible to c是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Pre-Building: The supplier may pre-build high running skus with approval of the Hong Kong team. This should be used to help level load production and accommodate production efficiency. Pre-building should not exceed 30 days of the 90 day material quantity so as not to reduce the supplier’s ability to be flexible to c
问题补充:

  • 匿名
2013-05-23 12:21:38
预大厦:供应商可与香港队的批准预建高位运行的SKU 。
  • 匿名
2013-05-23 12:23:18
建造前:供应商可以前修造高连续skus经香港队的批准。这应该用于帮助平实装载生产和容纳生产效率。建造前不应该超出90天物质数量的30天至于不减少供应商的能力是灵活的对在产品混合上的变化。
  • 匿名
2013-05-23 12:24:58
前大厦: 供应商可以前修造上流连续skus有香港队的认同。 应该用于这帮助平实装载生产和容纳生产效率。 前大厦不应该超出90天物质数量的30天至于不减少供应商的能力是灵活的对在产品混合上的变化。
  • 匿名
2013-05-23 12:26:38
预生成: 供应商可能预先生成高运行 sku 与 Hong 香港小组批准。这应该用于帮助加载生产和容纳生产效率水平。预生成不应超过 30 天的 90 天的材料数量,以免降低供应商的能力,能够灵活地适应产品结构的变化。