当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:D.The Supplier shall be responsible for the design and satisfy the system performance requirements of the FGD control system(ICMS) supplied by KOSEP. Any supplemental designs to improve and enhance system performance, to provide equipment and system protection and to meet stable operational requirements shall be provid是什么意思?

待解决 悬赏分:1 - 离问题结束还有
D.The Supplier shall be responsible for the design and satisfy the system performance requirements of the FGD control system(ICMS) supplied by KOSEP. Any supplemental designs to improve and enhance system performance, to provide equipment and system protection and to meet stable operational requirements shall be provid
问题补充:

  • 匿名
2013-05-23 12:21:38
D.The供应商应负责设计,满足了KOSEP提供烟气脱硫控制系统( ICMS )的系统性能要求。
  • 匿名
2013-05-23 12:23:18
D.The供应商负责设计并且满足KOSEP (ICMS)的供应的系统性能要求FGD控制系统。提供设备和系统保护和符合稳定的运作要求没有外加费用将提供改进和提高系统性能的所有补充设计。
  • 匿名
2013-05-23 12:24:58
D.The供应商负责设计并且满足KOSEP ICMS的供应的系统性能要求() FGD控制系统。 提供设备和系统防护和符合稳定的运作要求没有外加费用将提供改进和提高系统性能的所有补充设计。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
D.The 供应商将对设计负责和满足 FGD 控制的系统表现需求被 KOSEP 提供的 system(ICMS)。改善和提高系统表现,提供设备和系统保护,符合稳定运算要求的任何补充的设计将以没有附加成本被提供。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭