|
关注:1
2013-05-23 12:21
求翻译:L.The Supplier shall design and provide all documents and drawings specified in Paragraph 9 for KOSEP's FGD control system(ICMS) to operate the FGD system accurately, safely and reliably. If the KOSEP requests additional documentation for KOSEP's FGD control system implementation, such as control LCD display functions,是什么意思? 待解决
悬赏分:1
- 离问题结束还有
L.The Supplier shall design and provide all documents and drawings specified in Paragraph 9 for KOSEP's FGD control system(ICMS) to operate the FGD system accurately, safely and reliably. If the KOSEP requests additional documentation for KOSEP's FGD control system implementation, such as control LCD display functions,
问题补充: |
|
2013-05-23 12:21:38
L.The供应商应设计并提供第9 KOSEP的FGD控制系统( ICMS )操作FGD系统的准确,安全,可靠地指定的所有文件和图纸。
|
|
2013-05-23 12:23:18
L.The供应商为KOSEP的FGD控制系统(ICMS)将设计并且提供在段和图画指定的所有文件9准确地,安全地和可靠地操作FGD系统。如果KOSEP请求追加文献KOSEP的FGD控制系统实施,例如控制LCD显示起作用等等,供应商没有额外费用将提供它。
|
|
2013-05-23 12:24:58
L.The供应商为KOSEP的FGD控制系统ICMS将设计并且提供在段和图画指定的所有文件(9) 准确地,安全地和可靠地操作FGD系统。 如果KOSEP请求追加文献KOSEP的FGD控制系统实施,例如控制LCD显示起作用等等,供应商没有额外费用将提供它。
|
|
2013-05-23 12:26:38
为供应商应设计并提供所有文件和图纸中段 9 为 KOSEP 的烟气脱硫控制 system(ICMS) 以运行烟气脱硫系统,准确、 安全、 可靠地指定。如果 KOSEP 请求附加的文档为 KOSEP 的烟气脱硫控制系统的实施,如控制液晶显示功能等,供应商应提供它在没有额外的费用。
|
|
2013-05-23 12:28:18
L.The 供应商将设计和提供所有文件和为 KOSEP 的 FGD 控制在第 9 段中被指定的素描准确地操纵 FGD 系统的 system(ICMS),安全地和可靠地。如果对于 KOSEP 的 FGD 控制系统执行的 KOSEP 请求附加文件,例如控制 LCD 显示功能,等等,供应商以没有额外费用将提供它。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区