当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Original WELL “1” is an off-shore well. The well targeted a Pre-Khuff reservoir drilled with PDC bits and rotary. The well has had a troubled history. At a depth of 16,617 ft., well short of planned TD, in the Unayzah Formation, a twist-off occurred that necessitated continuing the well via a side track that begins 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Original WELL “1” is an off-shore well. The well targeted a Pre-Khuff reservoir drilled with PDC bits and rotary. The well has had a troubled history. At a depth of 16,617 ft., well short of planned TD, in the Unayzah Formation, a twist-off occurred that necessitated continuing the well via a side track that begins
问题补充:

  • 匿名
2013-05-23 12:21:38
原井“ 1 ”是一个离岸井。
  • 匿名
2013-05-23 12:23:18
原物井“1\"是一口近海井。井瞄准了转台式一个前的Khuff的水库操练与PDC位和。井有混乱的历史。在16,617英尺的深度,很好短缺计划的TD, Unayzah形成的,扭断发生了需要的继续很好通过开始在Unayzah形成的旁边轨道(16,200 ft)顶部。这条旁边轨道是成为turbodrilling的试验井“1\"
  • 匿名
2013-05-23 12:24:58
原物井“1”是一口近海井。 井瞄准了Pre-Khuff水库操练与PDC位和转台式。 井有混乱的历史。 在16,617英尺的深度,很好短缺计划的TD,在Unayzah形成,扭断发生了需要的继续很好通过开始在Unayzah形成上面16,200 ft的 (旁边轨道)。 这条旁边轨道是成为turbodrilling的试验井“1”
  • 匿名
2013-05-23 12:26:38
原井"1"也是离岸。并有针对性的扶轮社与 PDC 钻头钻前胡夫水库。井已陷入困境的历史。在 16,617 英尺,远远低于计划的 TD,在欧奈宰形成深度扭掉发生,有必要继续通过在欧奈宰形成 (16,200 英尺) 的顶部开始侧轨井。这侧轨是成为涡轮试验井"1"
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭