当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Another extension that appears attractive is the planning of curtailment that might become necessary due to loss of equipment or supply, or some other contingency. During the delivery day for a pipeline, some event often leads to an upset of the planned operation. A supply might be lost. A compressor station may lose c是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Another extension that appears attractive is the planning of curtailment that might become necessary due to loss of equipment or supply, or some other contingency. During the delivery day for a pipeline, some event often leads to an upset of the planned operation. A supply might be lost. A compressor station may lose c
问题补充:

  • 匿名
2013-05-23 12:21:38
出现吸引力另一个扩展是削弱的规划可能成为必要的,因为设备或供应,或一些其它的应变的损失。
  • 匿名
2013-05-23 12:23:18
看上去有吸引力的另一个引伸是也许成为必要由于设备或供应损失削减的计划,或者某一其他意外情况。在管道的交货日期间,某一事件经常导致计划的操作的翻倒。供应也许丢失。压缩机驻地也许通过设备故障丢失容量。当以煤气为燃料的电一代植物的发生激增,突然的大装载也许出现,越来越频繁发生。
  • 匿名
2013-05-23 12:24:58
看上去有吸引力的另一个引伸是也许成为必要由于设备或供应损失削减的计划,或者某一其他意外情况。 在交货日期间为管道,某一事件经常导致计划的操作的翻倒。 供应也许丢失。 压缩机驻地也许通过设备故障丢失容量。 当以煤气为燃料的电世代植物的发生激增,突然的大装载也许出现,越来越频繁发生。 如果日程表发送变得不能实行与可利用的资源由于这样事件,操作员也许被迫使削减交付对一个可打断的客户。 最重要的操作的问题在这种情况下出现作为几个形式: 1) 任何削减是否是必要的? 如果那样) 2,削减何时应该发生? 并且相关问题3) 削减应该必须发生和多么严厉它的地方?
  • 匿名
2013-05-23 12:26:38
看起来有吸引力的另一个扩展是削减的规划可能变得必要的设备或供应或一些其他不测事件损失。管道交付白天,一些事件常常导致冷门的计划的运作。供应可能会丢失。压缩机站可能会失去通过设备故障的能力。突然的大负载可能出现,越来越频繁地发生如发病率燃气发电植物遍布。如果预定的交付变得不可行与可用资源造成此类事件,运营商可能被迫减少传递到中断的客户端。在这种情况下所产生的最重要的业务问题有几种形式: 1) 是必要的任何限制吗?2) 如果是这样,应该削减什么时候开始?相关的问题 3) 削减地方应该采取的地方,并且必须有多么严重吗?
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭