当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The engineering department designs,produces,and tests the first model of a new product.These first models are called prototypes.In the engineering department,scientists conduct tests and experiments on new materials like plastics,ceramics,and metal alloys.Technicians also work in the engineering department.A technician是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The engineering department designs,produces,and tests the first model of a new product.These first models are called prototypes.In the engineering department,scientists conduct tests and experiments on new materials like plastics,ceramics,and metal alloys.Technicians also work in the engineering department.A technician
问题补充:

  • 匿名
2013-05-23 12:21:38
工程部门设计,生产和测试的新product.These第一款被称为prototypes.In工程部门的第一款车型,科学家进行测试和实验像塑料,陶瓷,金属alloys.Technicians新材料也工作在
  • 匿名
2013-05-23 12:23:18
工程部设计,导致,并且测试一个新产品的第一个模型。这些第一个模型称原型。在工程部,科学家做测试和试验在新的材料象塑料、陶瓷和金属合金。技术员在工程部也工作。技术员通常是一名熟练和老练的设计或工人。
  • 匿名
2013-05-23 12:24:58
工程部设计,导致,并且测试一个新产品的第一个模型。这些第一个模型称原型。在工程部,科学家在新的材料做测试和试验象塑料、陶瓷和金属合金。技术员在工程部也工作。技术员通常是一名熟练和老练的设计或工人。
  • 匿名
2013-05-23 12:26:38
工程部设计,生产,和测试一种新产品的第一个模型。这些第一次的模型被称为原型。工程处的科学家进行了测试和实验研究新的材料,如塑料、 陶瓷和金属合金。技术人员还在工程部工作。一名技术员通常是熟练,经验丰富的设计或生产工人。
  • 匿名
2013-05-23 12:28:18
设计部门设计,生产,首先测试一新 product.These 的第一模型模型称为 prototypes.In 设计部门,科学家行为在像塑料,陶艺,金属那样的新材料上检查和进行试验 alloys.Technicians 也为设计 department.A 技师腾出时间通常是一个熟练和熟练设计或生产工人。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭