当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:For ideal usage, a transient optimizer would be part of a bigger picture. Current pipeline conditions are always needed as a starting point. Thus, these would need to be determined using SCADA data and pipeline state estimation software. Future loads need to be predicted using nominations, or forecasting software. The 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
For ideal usage, a transient optimizer would be part of a bigger picture. Current pipeline conditions are always needed as a starting point. Thus, these would need to be determined using SCADA data and pipeline state estimation software. Future loads need to be predicted using nominations, or forecasting software. The
问题补充:

  • 匿名
2013-05-23 12:21:38
对于理想的使用,一过性的优化将是一个更大的图景的一部分。
  • 匿名
2013-05-23 12:23:18
对于理想的用法,一个瞬变优化器是一张更大的图片的一部分。当前管道情况总是必要,一个起点。因此,使用SCADA数据和管道状态估计软件,这些将需要被确定。使用提名或者预测软件,未来装载需要被预言。使用稳态最佳化,目标状态需要被计算,也需要未来装载估计。这些过程将一起哺养所有的领带瞬变优化器。
  • 匿名
2013-05-23 12:24:58
为理想的用法,一个瞬变优化器是一张更大的图片的一部分。 当前管道情况总必要作为出发点。 因此,这些将需要使用SCADA数据和管道状态估计软件被确定。 未来装载需要使用提名或者预测软件被预言。 目标状态需要使用稳态最佳化被计算,也需要未来装载估计。 这些过程所有领带将一起哺养瞬变优化器。 结果可能然后通过入一个情况通知的报告环境为操作员、计划者和去市场的人,或者他们可能传递到其他模仿包裹为证明和显示,我们在我们的例子中做了。
  • 匿名
2013-05-23 12:26:38
对于理想的用法,瞬变的优化器将大图片的一部分。当前管道条件总是需要为出发点。因此,这些将需要使用 SCADA 数据确定和管道状态估计软件。未来的负载需要预测使用提名,或预测软件。采用稳态优化,还需要今后的负荷估计计算所需要的目标状态。这些过程将所有的领带,携手共进,共饲料瞬态优化程序。结果可能然后被传递到咨询报告环境为运营商、 规划师和市场营销人员,或他们可能会转嫁到核查和显示,其他仿真程序包一样在我们的示例。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭