当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2)All ICMS, PLC and microprocessor based equipment shall be retested after installation at the site in order to check all possible damages during the delivery and installation. The Supplier shall provide the test programs, schedules, technical directions, and prepare test reports of the system. The KOSEP will witness t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2)All ICMS, PLC and microprocessor based equipment shall be retested after installation at the site in order to check all possible damages during the delivery and installation. The Supplier shall provide the test programs, schedules, technical directions, and prepare test reports of the system. The KOSEP will witness t
问题补充:

  • 匿名
2013-05-23 12:21:38
2 )所有ICMS ,PLC和基于微处理器的设备应安装后才能交付和安装过程中,检查所有可能的损失进行复检在现场。
  • 匿名
2013-05-23 12:23:18
2)所有ICMS、PLC和基于微处理机的设备在站点的设施以后将再实验为了在交付和设施时检查所有可能的损伤。供应商提供测试程序,日程表,技术方向,并且准备系统的实验报告。KOSEP将目击测试。
  • 匿名
2013-05-23 12:24:58
在)交付和设施期间, 2所有ICMS、PLC和根据微处理机的设备在设施以后将再实验在站点为了检查所有可能的损伤。 供应商提供测试程序,日程表,技术方向,并且准备系统的实验报告。 KOSEP将目击测试。
  • 匿名
2013-05-23 12:26:38
2) 所有 ICMS、 PLC 和微机设备应安装在站点后测试,在交付和安装过程中检查所有可能的损害。供应商应提供的测试计划、 日程安排、 技术方向、 并编写测试报告,系统。KOSEP 将会见证测试。
  • 匿名
2013-05-23 12:28:18
2) 都 ICMS, PLC 和被设立的微处理机设备将被重新测试在地点的安装之后以在发送和安装期间检查所有可能的损害。供应商将提供测试程序,安排,技术方向,准备测试系统的报告。KOSEP 将目击测试。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭