当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This design mainly includes following content: The project construction organization designs, the construction floor-plan.In order to guarantee the time limit for a project, the quality and the security, the civilized work site, saves conditions and so on cost, establishes the pointed construction organization plan, ea是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This design mainly includes following content: The project construction organization designs, the construction floor-plan.In order to guarantee the time limit for a project, the quality and the security, the civilized work site, saves conditions and so on cost, establishes the pointed construction organization plan, ea
问题补充:

  • 匿名
2013-05-23 12:21:38
这样的设计主要包括以下内容:本项目施工组织设计,施工floor-plan.In为了保证工期的项目,质量和安全,文明工地,节省条件等成本,建立
  • 匿名
2013-05-23 12:23:18
这么, 这样地   这; 今, 本; 这个
  • 匿名
2013-05-23 12:24:58
这个设计主要包括跟随内容: 项目建筑机构设计,建筑地板计划。为了保证期限为项目、质量和安全,文明的工作地点,节省情况等等费用,建立针对性的建筑组织计划,每个分支次级项目项目特征,结构特征,建筑困难程度期限为项目,并且质量要求,建立实用和可行的建筑计划。顺利地指示建筑成本工程学项目建筑,控制工程费用,基础高质量项目。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭