求翻译:The contents of major project construction scheme shall at least include: construction preparation (including technical document, equipment and materials, manpower, construction water and power supply, construction area and safety facilities, etc), main construction machinery equipment planed to use, the overall arrang是什么意思?![]() ![]() The contents of major project construction scheme shall at least include: construction preparation (including technical document, equipment and materials, manpower, construction water and power supply, construction area and safety facilities, etc), main construction machinery equipment planed to use, the overall arrang
问题补充: |
|
2013-05-23 12:21:38
重大项目建设方案的内容至少应包括:施工准备(包括技术文件,设备和材料,人力,建设供水,供电,建筑面积和安全设施等) ,主要施工机械设备拟使用,整体
|
|
2013-05-23 12:23:18
这, 那; 这些, 那些
|
|
2013-05-23 12:24:58
主要项目建筑计划内容至少包括: 建筑准备 (包括技术文件、设备和材料,人力、建筑水和电源、建筑区域和安全设施等等),主要建筑机械设备计划使用,建筑做法的整体安排,主要规程和特别规程,建筑日程表,建筑质量管理措施,安全的建筑方法并且文明化了建筑措施、职业卫生管理措施和危险点管理措施等等。
|
|
2013-05-23 12:26:38
重大项目建设计划的内容至少应包括: 施工准备 (包括技术文档、 设备、 材料、 人力、 建设供水、 供电、 建筑面积和安全设施等)、 打算使用的主要施工机械设备、 施工程序、 施工方法的主要程序与特别程序、 施工进度、 施工质量控制措施、 安全和文明的施工措施的总体安排职业卫生管理措施及危险点控制措施等。
|
|
2013-05-23 12:28:18
主要项目建造计划的目录至少将包括:建造筹备 ( 包括技术文件,设备和材料,人力,建造水和电源,建造领域和安全设施,等等 ),主要建造机器设备飞使用,建造程序,主要程序和特别的程序的建造方法的总体安排,建造时间表,建造质量管理测量,安全和使建造文明测量,职业健康管理测量和危险的点控制测量,等等
|