当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The selection of ITP points shall be based on control of important quality characters. During selection of key control points, considerations such as main steps, omitted process or class, environmental conditions, construction scheduling, new or newly-commenced construction activities or technology and design requireme是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The selection of ITP points shall be based on control of important quality characters. During selection of key control points, considerations such as main steps, omitted process or class, environmental conditions, construction scheduling, new or newly-commenced construction activities or technology and design requireme
问题补充:

  • 匿名
2013-05-23 12:21:38
ITP的点的选择应基于重要的品质性状的控制。
  • 匿名
2013-05-23 12:23:18
ITP的点的选择应根据质量控制的重要人物。 在选择关键性的控制要点、注意事项如主要步骤,忽略了过程,或类、环境条件、建设计划、新事实或新的开始建设活动或技术和设计要求的范围内的工作包应予以考虑。
  • 匿名
2013-05-23 12:24:58
ITP点的选择根据重要质量字符控制。 在关键控制点的选择期间、考虑例如主要步,预定,新或新开始的建筑活动或技术和设计要求在工作包裹的范围内被省去的过程或者类、环境状况,建筑将被考虑到。
  • 匿名
2013-05-23 12:26:38
ITP 点的选择应基于控制的重要品质性状。在选择关键控制点、 主要步骤、 省略的过程或类的考虑,环境条件、 施工进度计划、 新的或新开工建设活动或工作包范围内的技术和设计的要求应考虑到。
  • 匿名
2013-05-23 12:28:18
ITP 的选择指将依据对重要高级文字的控制。在主要控制的选择期间点,考虑例如主要步骤,省略过程或课,环境条件,建造安排,新或者刚开始的建造活动或技术和设计要求在工作包裹的范围内将被考虑。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭