当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Laying, vibration, rolling concrete must be strictly to ensure the reinforcement spacing and position accuracy.After the initial set of concrete water collection, promptly remove the seam partition lattice, use iron float shall be second times of compaction finishing, and timely repair the defect part of lattice sew, d是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Laying, vibration, rolling concrete must be strictly to ensure the reinforcement spacing and position accuracy.After the initial set of concrete water collection, promptly remove the seam partition lattice, use iron float shall be second times of compaction finishing, and timely repair the defect part of lattice sew, d
问题补充:

  • 匿名
2013-05-23 12:21:38
铺设,振动,滚动混凝土必须严格保证了钢筋间距和位置accuracy.After最初设定具体的水收集,及时清除缝分区格,用铁抹子压实被整理第二次,并及时修复缺陷
  • 匿名
2013-05-23 12:23:18
敷设、
  • 匿名
2013-05-23 12:24:58
放置,振动,滚动的混凝土必须严密地是保证增强间距和安置准确性。在最初的套具体水收藏,及时地取消缝分开格子之后,使用铁浮游物将是击实精整的第二次,并且格子的瑕疵零件缝合的实时性修理,做平展直接; 当混凝土,在最后的套第三协定和光,不要求平面,沙子,层数之前,不涂灰泥抹压力,凹进的板材,将洒干燥水泥或干燥水泥灰浆。直到在最后的混凝土硬化之后,比14d必须在浇灌不是较少以后立刻执行,湿粗麻布袋盖子,而维护保证覆盖物材料湿和取缔维护在屋顶或在惊逃闲人继续建筑。
  • 匿名
2013-05-23 12:26:38
铺设、 振动、 碾压混凝土必须严格以确保钢筋间距及位置精度。混凝土的水收集的初始集及时删除煤层分区格,用铁抹子应的压实抹光,第二次,及时修复的晶格缺陷一部分缝后,做平直 ;当之前最后一组的第三次压缩和光,混凝土不需要平面、 砂、 层、 抹灰板擦压力,缩进,应洒干法水泥或干水泥砂浆。直到后混凝土的最终设置,必须进行维修立即,湿的麻布袋盖浇水不小于 14 d 后,同时维修保障覆盖材料湿,并禁止在屋顶上或在踩踏事件托辊继续建造。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭