当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:corrections or comments made on contractors shop drawings during the review do not relieve the contractor from compliance with contract drawings and specifications this shop drawing has been reviewed for conformance with where contract documents only contractor is responsible for confirming and correlating all quantiti是什么意思?

待解决 悬赏分:1 - 离问题结束还有
corrections or comments made on contractors shop drawings during the review do not relieve the contractor from compliance with contract drawings and specifications this shop drawing has been reviewed for conformance with where contract documents only contractor is responsible for confirming and correlating all quantiti
问题补充:

  • 匿名
2013-05-23 12:21:38
在审查期间对承包商施工图更正或意见并不免除符合合同图纸和规范这个施工图已一致性审查与在合同文件只承包商负责确认和关联所有的数量和尺寸,制造工艺承包商
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
在承包商商店图画或评论做出的更正在回顾期间不解除承包商从遵照合同图画,并且规格这张商店图画被回顾了的依照与,在哪里合同仅文件承包商负责对证实和关联所有数量和维度、制造过程和技术,协调与其他一起使用换。 并且工作的令人满意和安全表现。
  • 匿名
2013-05-23 12:26:38
更正或评论意见,承建商在审查期间的施工图纸做不解除承包商的合同图纸和规格绘制此店已审查符合遵守在合同文件只有承包商负责确认和关联所有的数量和尺寸、 制作工艺和技术,与其他行业的协调工作。和令人满意和安全性能的工作。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭