当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Supply and installation of an insulating layer of moisture to the surface consists of a coil of PVC single-layer thickness of 1.6 mm or coil of EPDM with a thickness of 1.5 mm or equivalent and by the adoption of the supervising engineer with the work overalls higher than the final attributed to the tile to 15 cm depen是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Supply and installation of an insulating layer of moisture to the surface consists of a coil of PVC single-layer thickness of 1.6 mm or coil of EPDM with a thickness of 1.5 mm or equivalent and by the adoption of the supervising engineer with the work overalls higher than the final attributed to the tile to 15 cm depen
问题补充:

  • 匿名
2013-05-23 12:21:38
供应和安装湿气的绝缘层的表面的组成为1.6mm或EPDM的线圈的厚度为1.5毫米或等效的PVC单层厚度的线圈和通过采用监理工程师的配合工作工作服更高
  • 匿名
2013-05-23 12:23:18
补给, 提供, 供给; 替代他人职务, 替代   补给, 供应品, 供给
  • 匿名
2013-05-23 12:24:58
湿气一块绝缘层的供应和设施对表面决赛归因于瓦片到cm根据表面不同的地方最后的取向装载平的米的包括1.6毫米的PVC单层厚度EPDM卷或卷以1.5毫米或等值的厚度和由监督的工程师的收养用工作总体更加高于价格的15在铝墙壁区段被确认并且也运载价格所有保护层数在绝缘材料层数上下与所有必要的辅助部件和其他,直到设备的规则的制定出总之方面的结尾和圆顶 点燃根据什么我找到,根据监督的工程师的计划和规格和指示。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭