当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Supply, installation and test pumping of the kind P.WP-1 feeding drinking water and washing column water group and item includes tank control pressure valve 75 liter and the group must be a previous assembly on the base of the steel and ready to be installed according to the specifications and drawings sectors.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Supply, installation and test pumping of the kind P.WP-1 feeding drinking water and washing column water group and item includes tank control pressure valve 75 liter and the group must be a previous assembly on the base of the steel and ready to be installed according to the specifications and drawings sectors.
问题补充:

  • 匿名
2013-05-23 12:21:38
供应,安装和那种P.WP - 1喂食饮用水和洗涤塔水组和项目测试包括抽水箱压力控制阀75升,组必须是以前的组装钢和准备的基础上进行安装
  • 匿名
2013-05-23 12:23:18
供应、安装和测试的一种临WP1喂入饮用水和洗涤列水组和项目包括箱控制压力阀75升和组必须为大会以前的基座上钢和准备就绪,可以安装根据规格、图纸的部门。
  • 匿名
2013-05-23 12:24:58
供应、设施和测试抽亲切的P.WP-1哺养的饮用水和洗涤物专栏水小组和项目包括坦克控制压力阀75公升,并且小组在钢的基地必须是一个早先汇编和准备根据规格和图画区段安装。
  • 匿名
2013-05-23 12:26:38
供货、 安装及测试泵种 P.WP 1 喂养饮用水和洗涤列水组,项目包括罐控制压力阀 75 升集团必须和钢的基础上的上届大会准备根据规格和图纸部门安装。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭