当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Based on numerical modeling of stress–strain state of rocks and the in situ deformation monitoring of rocks mass surrounding underground excavations, the authors determine stability criteria for mine structural elements in terms of the Aikhal Mine where mining has been transferred under the worked-out open pit bottom. 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Based on numerical modeling of stress–strain state of rocks and the in situ deformation monitoring of rocks mass surrounding underground excavations, the authors determine stability criteria for mine structural elements in terms of the Aikhal Mine where mining has been transferred under the worked-out open pit bottom.
问题补充:

  • 匿名
2013-05-23 12:21:38
基于岩石应力 - 应变状态的数值模拟和岩石周围群众地下开挖的原位变形监测,作者确定稳定性标准矿结构元素在Aikhal矿开采的地方已下制定出公开转让条款
  • 匿名
2013-05-23 12:23:18
基于数字建模的应力应变状态的石块和在现场进行变形监测的岩石周围大规模地下挖掘,作者确定稳定的排雷标准结构要素的排雷凡采矿aikhal已移交给工作的开放式坑底部。 使用确定的标准、应力应变状态和下陷的支柱的官方评估,考虑到当前阶段对水在露天。
  • 匿名
2013-05-23 12:24:58
基于围拢地下挖掘的数字塑造岩石应力状态和岩石大量在原处变形监视,作者确定稳定性准则为我的结构元素根据Aikhal矿,采矿转移了在worked-out露天开采矿底部之下。 使用坚定的标准,冠柱子的应力状态和沉淀在露天开采矿被估计,考虑地下水位的当前阶段。 文章给变化的有预测性的估计在冠柱子的应力状态和沉淀的上在水levelraising。
  • 匿名
2013-05-23 12:26:38
作者基于数值模拟的应力 — — 应变状态的岩石和岩石围地下挖掘的原位变形监测,确定稳定性判据矿用结构元素的艾哈尔矿山采矿已经根据采空方面打开坑底。使用确定的标准,顶柱沉降与应力 — — 应变状态评估,考虑中露天采坑的水表的当前阶段。这篇文章给顶柱上水 levelraising 沉降及预测估计的应力 — — 应变状态的改变。
  • 匿名
2013-05-23 12:28:18
根据数字岩石的压力类型的州的模拟和在监测的岩石的 situ 变形中大量周围地下挖掘,作者为了我的确定稳定性标准就开矿在想出敞开的坑底部下被传输了的 Aikhal 矿而言的结构的元素。使用有决心的标准,压力类型的州和王冠柱子的 subsidence 被评估,考虑地下水位在敞开的坑的当前阶段。文章在 levelraising 的水上给王冠柱子在压力类型的州和 subsidence 方面的变化的预言性的估计。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭