|
关注:1
2013-05-23 12:21
求翻译:(4) in order to solve the concrete shrinkage deformation and temperature stress, the specification through after pouring construction method of post-cast strip construction of incomplete construction according to design requirements, such as construction without tongue-and-groove seam是什么意思?![]() ![]() (4) in order to solve the concrete shrinkage deformation and temperature stress, the specification through after pouring construction method of post-cast strip construction of incomplete construction according to design requirements, such as construction without tongue-and-groove seam
问题补充: |
|
2013-05-23 12:21:38
(4)为了解决混凝土收缩变形和温度应力,通过根据设计要求,如建筑,而不舌和凹槽接缝浇注不完全施工后的铸钢带施工的施工方法后的规范
|
|
2013-05-23 12:23:18
(4)为了解决具体的收缩变形和温度应力,规范建设通过倒后的开机自检方法的领衔主演地带建造的未完成的建造根据设计要求,如建筑没有榫槽型接缝
|
|
2013-05-23 12:24:58
(4) 为了通过解决具体收缩变形和温度重音,规格,在倾吐建筑方法根据设计要求之后岗位熔铸了残缺不全的建筑的小条建筑,例如建筑,不用舌头和凹线缝
|
|
2013-05-23 12:26:38
(4) 为解决混凝土的收缩变形和温度应力,通过规范后浇筑施工方法的后浇带施工不完全按设计要求,如无榫槽缝施工
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区