|
关注:1
2013-05-23 12:21
求翻译:In the process of setting out, also on the segment from the end part of controlling the retest. After inspection, the RTK accuracy setting out fully to meet the desired specifications.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
In the process of setting out, also on the segment from the end part of controlling the retest. After inspection, the RTK accuracy setting out fully to meet the desired specifications.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区