当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Fig. 5, Fig. 6 and Fig. 7 show the engine indicator diagram based on selected port and cylinder geometries, Table 1. It is found that for operation at 2000 rpm the outlet port would close 10?later than operation at 1000 rpm, 335? for the first case and 345?for second. Inlet port is closed at 75? and outlet port is open是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Fig. 5, Fig. 6 and Fig. 7 show the engine indicator diagram based on selected port and cylinder geometries, Table 1. It is found that for operation at 2000 rpm the outlet port would close 10?later than operation at 1000 rpm, 335? for the first case and 345?for second. Inlet port is closed at 75? and outlet port is open
问题补充:

  • 匿名
2013-05-23 12:21:38
图。
  • 匿名
2013-05-23 12:23:18
图。 5、无花果。 6和无花果树。 7显示发动机指示灯图根据选定的端口和油缸几何体,表1。 它是发现,在2000转 分转速运转的插座端口将关闭10°迟于工序在1000转 分,335? 对于第一种情况下和345?第二。 入口端口已关闭在75? 和出口端口打开160°曲轴革命。 图。 5显示的指示灯图在1000转 分和无花果树。 图6显示了此操作在2000转 分和同一进口条件的图。 5。
  • 匿名
2013-05-23 12:24:58
。 5。 6和。 7展示根据选择的口岸和圆筒geometries的引擎显示图,表1。 它被发现为操作在2000转每分钟出油口将结束10 ?更晚比操作在1000转每分钟, 335 ? 为第一案件和345 ?为第二。 进气孔口是闭合的在75 ? 并且出油口被打开在160 ?摇晃的革命。 。 5个展示显示图为操作在1000转每分钟和。 6个展示这张图为操作在2000转每分钟以同样入口条件。 5.
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
无花果。5,无花果。6 和无花果。7 显示根据指定的港和圆柱的引擎指标图表几何,表 1。被找到那对 2000 rpm 的操作出口端口结束会 10?在 1000 rpm, 335 处晚于操作?对第一案例和 345?有秒。水湾移植在 75 处被关闭?以及出口移植在 160 处被打开?奇怪的革命中。无花果。5 次显示 1000 rpm 和无花果的操作的指标图表。6 次显示有无花果的相同的水湾条件的 2000 rpm 的操作的这张图表。5.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭