当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The verification phase will integrate the Commissioning that includes FAT, and SAT, and Qualification activities. Testing that focus on the critical aspects of the manufacturing system will be documented under document names: Design Qualification, Installation Qualification, Operation Qualification, and Performance Qu是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The verification phase will integrate the Commissioning that includes FAT, and SAT, and Qualification activities. Testing that focus on the critical aspects of the manufacturing system will be documented under document names: Design Qualification, Installation Qualification, Operation Qualification, and Performance Qu
问题补充:

  • 匿名
2013-05-23 12:21:38
验证阶段将整合包括FAT ,和SAT和认证活动的调试。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
证明阶段将集成委任那包括油脂和SAT和资格活动。 测试那个焦点在制造系统的重要方面将被提供以文件名字: Design Qualification, Installation Qualification, Operation Qualification, and Performance Qualification. Design Qualification will be performed concurrently with the design review and risk assessment process. These documents will be reviewed and a
  • 匿名
2013-05-23 12:26:38
验证阶段将包括脂肪和 SAT 的调试及资格活动。 测试制造系统的关键方面,重点将记录下文档名称: 设计资质、 安装资质、 经营资格和性能鉴定。 设计资质将执行与设计审查和风险评估过程。这些文件将进行审查,并由质量部门批准。
  • 匿名
2013-05-23 12:28:18
查证阶段将集成委托那包括脂肪,坐,资格活动。测试那着重于制造系统的重要方面将在文件下被记载名字:设计资格,安装资格,操作资格,表现资格。设计资格将随着设计审核同时被实行和冒险评估过程。这些文件将被查看和被高级单位批准。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭