|
关注:1
2013-05-23 12:21
求翻译:A suitable value has to be assigned also to the excavation depth H exc (s). A maximum excavation depth of 6 m is reported in the literature (Yoon et al., 2009). The latter value can be replaced by the maximum depth reached by the excavators used by emergency responders, though lower depths, in the range of 0.5–1.5 m ar是什么意思? 待解决
悬赏分:1
- 离问题结束还有
A suitable value has to be assigned also to the excavation depth H exc (s). A maximum excavation depth of 6 m is reported in the literature (Yoon et al., 2009). The latter value can be replaced by the maximum depth reached by the excavators used by emergency responders, though lower depths, in the range of 0.5–1.5 m ar
问题补充: |
|
2013-05-23 12:21:38
合适的值也必须被分配给挖掘深度H EXC (多个) 。
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
一个合适的值必须也被分配到开挖深度 H exc (s)。6 米的最大开挖深度报道文学 (尹等人,2009年)。后者的价值可以取而代之挖掘机采用紧急救援人员,虽然低深度达到的最大深度、 范围 0.5-1.5 m 通常采用,由于单一成本高的污染土壤挖掘和填埋场处置。
|
|
2013-05-23 12:28:18
一种合适的价值必须到挖掘深度也被指定 H exc(s)。6 米的最大程度的挖掘深度在文献中被报告 ( Yoon et al., 2009 年 )。后一价值可以被最大程度的深度替换由被紧急情况应答者使用的开凿者达到,虽然降低深度,在系列 0.5-1.5 米通常被采用,由于被污染的土壤的挖掘和垃圾处理的高单位的费用。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区